Supply and installation of a 200 mm thick sandwich panel on a concrete slab, with a vapor barrier in accordance with the approved thermal project.Roof finishes in 2 mm thick zinc sheet lacquered in the color of the building.
Installation of aluminium skylights with thermal break and triple glazing and a motorized technical smoke removal skylight in accordance with the requirements of the fire safety project.
Installation of stainless steel railings in two existing stairwells in the building for a total of 90 ml.

Location
Switzerland – Newchatel

Execution time
1 month